|
PIDEC |
|
The Largest Engineering Company of Iran |
Implementing over Forty Major Oil & Petrochemical
Projects
|
 |
|
Bahman
Reza Pourjafar, PIDEC Managing Director |
Petrochemical Industries Design and Engineering Company was founded by members
of the board of directors of the National Iranian Petrochemical Industries
Company in Iranian calendar month of Aban (October/November) 1985 with an aim
to gain access to technical and industrial self-sufficiency and transfer and
develop technology through implementation of designing and engineering
operations in the field of industrial projects especially in oil, gas and
petrochemical industries.
Meanwhile, implementation of logistics operations relevant to industrial
projects, supervision over operation and construction of major projects and
other accomplishments which provided for gaining access to the announced
target, either independently or with the cooperation of domestic and foreign
companies were among its other targets. In subsequent stages all the shares of
the company were ceded to the private sector.
PIDEC with a current capacity of over 3 million people/hour technical and
engineering potential per year is capable of implementing oil industry
projects within the country as well as participating in foreign bids and thus
allocating parts of its engineering capacity to projects outside the country.
PIDEC has a record of participation with license holder and technologically
equipped companies and creditable foreign contractors or successfully
implementing projects independently over the past 40 years.
The company, since its establishment up to date, has also offered valuable
services in the area of implementing oil, gas and petrochemical industrial
projects and in addition to the training of engineers and strengthening its
technical personnel and promotion of their technical know-how has made
constant efforts for developing suitable background for the transfer of
technology and technical know-how on dynamic and innovative basis and has
gained outstanding achievements through cooperation with creditable world
companies and has always taken pioneering steps with an aim to upgrade its
engineering capabilities.
A brief review of the projects implemented by PIDEC shows that the company is
capable of implementing projects with basic engineering and could
independently accomplish a series of detailed engineering services up to the
final stages of purchasing and supplying machineries and actively participate
in the construction, operation and exploitation of major industrial projects.
PIDEC has taken advantage of license holding companies with high technology as
its foreign partners or subsidiary contractors in offering engineering
services or has been able to conclude exclusive license agreements with
creditable foreign companies. Furthermore, PIDEC by relying on its past
experience in engineering of complicated petrochemical and oil projects could
undertake principled engineering of non-licensed units and if necessary
through scaling up with the assistance of its research structure could also
cover principled engineering of under license units.
It should be noted that implementation of projects such as Bandar Imam MTBE,
Avicenna aromatic and project for increasing capacity of Abadan refinery
(first phase) and Razi third ammonia unit are among projects that have been
independently implemented by PIDEC and have already been put into operation.
The following are other projects that have been accomplished by Petrochemical
Industry Design and Engineering Company (PIDEC):
-
Urea and ammonia project at South Pars special zone (Ghadir one and two
petrochemicals)
-
Methanol 4th first and second project (Zagros methanol)
-
Jam ethylene oxide ethylene glycol (EO/EG) project, (Jam petrochemicals)
-
Ethylene oxide ethylene glycol project (Maroon petrochemicals)
-
Heavy polyethylene project HDPE (Amir Kabir petrochemicals)
-
Third aromatic project (Avicenna petrochemicals)
-
Kharg NGL compressor platform project
-
Abadan Refinery third phase development project
And currently:
-
Bandar Abbas gasoline production increase project
-
Pars oil refinery project (basic engineering services)
-
Sabalan methanol project
-
VenIran methanol project
-
EPC Hengam urea/ammonia project are under implementation.
|